cost increase
英
美
成本增加
双语例句
- Analysis and Evaluation of Medical Cost Increase for Inpatients
住院患者医疗费用上涨的分析及评价 - The water cut of oil well increases, the production decreases, and the infrastructure investment and cost increase.
油井含水增加,产量下降,基本建设投资增加,成本增大。 - Production increased steadily. The growth rate was somewhat lower than that of last year. This increased yield will reduce still further the net cost increase.
生产稳定增长,增速比上年有所回落。产量增加则会使净增费用降低一些。 - After China entered WTO, the development degree of construction market become higher and higher, the bidding system must be carried out, the biding opportunity increases and at the same time the bidding difficulty and cost increase, too.
加入WTO后,对建设市场开发的程度愈来愈高,与国际接轨的招投标制度势在必行,既增加了投标的机会,又增加了投标的难度和成本; - The low penetrate ratio can get low oil extraction velocity and low degree of reserve recovery, so it is low income; but if the ratio is too high, the cost increase and oil increment decrease, economic benefit isn't very well.
较小的裂缝穿透比只能获得较低的采油速度和采出程度,所获收益较小:但裂缝半径太大,压裂成本增加而增油量相对减小,经济效益并不好。 - Under the new situation of harmonious and sustainable development, higher education should stick to the principle of "the quality posed by scale" and "the scale quality guaranteed by the quality" and regenerative quality view to construct the lower cost increase pattern.
在以追求和谐和可持续发展为基调的新情境下,高等教育的发展理应以有规模支撑的质量和有质量保证的规模的原则及再生性质量观来构建低代价高等教育增长模式。 - However, because of the labor cost increase, and the restriction of RMB appreciation pressure, the competitiveness of logistics enterprise in our country has gradually weakened.
但是,由于人力成本增长、人民币升值压力的制约,我国物流企业的竞争力逐渐被削弱。 - Prebiopsy desmopressin administration decreases the risk of bleeding and hematoma size in patients undergoing percutaneous kidney biopsy without a cost increase.
在经皮肾穿刺患者中,穿刺前给予去氨加压素减少出血风险、减少血肿大小,而不增加住院费用。 - In construction of a international water conservancy project, amount of works increases with variation of natural in-situ conditions, which leads to construction delay and construction cost increase, then economic losses of the Contractor.
在国际水利工程施工中,由于现场自然条件的改变(而非承包商的原因)引起工程量的增加,势必会导致工期延误和施工费用的增加,给承包商造成工期和经济损失。 - This increased yield will reduce still further the net cost increase.
产量增加则会使净增费用降低一些。
